机构地区:[1]苏州市能工基础工程有限责任公司,江苏苏州215011
出 处:《岩土工程学报》2010年第S2期471-474,共4页Chinese Journal of Geotechnical Engineering
摘 要:回转型可回收扩大头锚杆,使用特制的合页式承压板,分别将三根U形回转的无黏结钢绞线锁住,然后按照特定的要求绑扎成锚杆杆体。采用高压喷射成孔工艺,成孔完成后,将杆体穿过内径为110~135mm的钢套管,置入地层中的扩大头内。利用钢绞线自身的弹性,将合页式承压板弹开。然后在扩大头孔底注浆,置换出原扩孔混合浆液。在基坑支护完成后,可将钢绞线从锚杆注浆体内拔出,达到回收的目的。该工艺主要解决锚杆出红线的问题。A kind of retrievable enlarged-end anchor with looped string is introduced.After three steel-strings are locked in U-loop by using a certain hinged bearing plate separately,they are assembled into a cable.The enlarged-end hole is constructed by high-pressure jet water or serous-cement technology,then the cable is inserted into the enlarged-end underground hole through a steel-pipe with inside-diameter of 110 ~135 mm.The steel-strings are opened by itself,together with the hinged bearing plate.The water-cement mixture is replaced by grouting with cement.The steel-strings can be retrieved after the foundation-pit is backfilled.This technology can prevent the anchor from overstepping red line.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15