饱和盐渍土地基处理孔隙水压力实测分析  被引量:10

Test analysis on pore water pressure in ground treatment to saturated saline soil

在线阅读下载全文

作  者:陈耀光[1] 杨军[1] 彭芝平[1] 连镇营[1] 陶玲[1] 

机构地区:[1]中国建筑科学研究院地基基础研究所,北京100013

出  处:《岩土工程学报》2010年第S2期529-532,共4页Chinese Journal of Geotechnical Engineering

摘  要:通过对青海察尔汗盐湖地区的饱和盐渍土天然地层强夯和碎石排水桩加强夯进行孔隙水压力测试,重点探讨了碎石排水桩加强夯处理盐渍土地基孔隙水压力变化特性、强夯时孔隙水压力峰值与土层表面接触应力峰值的关系、不同夯击遍数下的孔隙水压力、排水桩的作用以及强夯夯击间歇时间等问题,对碎石排水桩加强夯处理饱和盐渍土地基技术的研究与工程实践有一定的指导意义。Pore water pressure(PWP) is measured when dynamic consolidation with drain pile(DPD) are performed to improve ground with saturated saline soil in Qinghai Chaerhan salt lake area.The results are used to analyze the characteristics of PWP variation in DPD,the relationship between summits of PWP and contact dynamic stress in dynamic consolidation,the effect of compact times on PWP,the function of drainage stone columns and the intermission between compacts.It has certain instructive significance for research and engineering practice on saturated saline ground in the future.

关 键 词:强夯 盐渍土 孔隙水压力 碎石排水桩加强夯法 

分 类 号:TU472.3[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象