检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]四川电力公司调度中心,四川成都610041 [2]重庆大学电气工程学院,重庆400030
出 处:《四川电力技术》2009年第2期33-36,共4页Sichuan Electric Power Technology
摘 要:基于IEC 61850协议的数字化变电站实现了整个变电站内信息共享。基于此,继电保护系统的可靠性指标应有新的提高。从提高数字化变电站保护系统可靠性出发提出了两种保护装置故障的后备措施:SBPU-Shared Back-up Protection Unit(用于解决保护单元失效)和SB-Software Back-up(用于解决互感器失效)。并进一步通过信息流仿真,得到后备可靠性方案的投切时间。结果表明,所提两种方案均具有可行性。Digital substation based on IEC 61850 takes information sharing into account within the whole substation. Hereupon, the reliability index of relay protection system should be upgraded. Two backup measures are proposed for the fault of protective devices: SBPU -Shared Back- up Protection Unit( used to solve the invalidation of protection unit)and SB- Software Back - up ( used to solve the invalidation of current and voltage transformers). And then, the switching time of backup reliability scheme can be obtained through information flow simulation. The result shows that both of these two proposed schemes are feasible.
关 键 词:数字化变电站 可靠性 信息流仿真 投切时间 可行性
分 类 号:TM762[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.18