果子沟段的线路设计  

Route Design of Guozigou Section of Second West to East Gas Pipeline Project

在线阅读下载全文

作  者:张弥[1] 杨建[1] 蔡杭平[1] 

机构地区:[1]中国石油天然气管道局设计院,河北廊坊065000

出  处:《石油工程建设》2010年第S1期37-39,295,共4页Petroleum Engineering Construction

摘  要:西气东输二线管道工程在新疆伊犁果子沟翻越天山山脉,整个果子沟段不仅有7条山岭隧道,还有施工难度极大的38道弯,且沟内管道沿线地质灾害分布较多,沟谷狭长且常年流水不断,管道设计、施工难度大。从果子沟段线路的优化设计、管道壁厚设计、38道弯高陡段线路纵向设计以及水工保护设计等几个方面介绍了该段管道线路的设计方法。Second West to East Gas Pipeline crosses Tianshan Mountain in Guozigou of Yili, Xinjiang. There are 7 mountainous tunnels and 38 steep slope turnings along the pipeline route in Guozigou gully, where geological disasters happen frequently, the gully is long and narrow with perennial stream. So that the pipeline design and construction are very difficult. In this paper, the pipeline route design methods for Guozigou section are presented with respect to route optimization design, pipe thickness design, route longitudinal design at the 38 turnings and hydraulic protection.

关 键 词:长输管道 山岭隧道 水工保护 线路设计 

分 类 号:TE973.1[石油与天然气工程—石油机械设备]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象