检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国石油天然气管道局设计院,河北廊坊065000
出 处:《石油工程建设》2010年第S1期56-58,296-297,共5页Petroleum Engineering Construction
摘 要:在西气东输二线管道工程压气站场的UPS供电系统设计中,将站场UPS系统和压缩机组UPS系统合理整合,在整体结构上有了较大改进,可向各种重要负载提供连续、稳定、纯净、可靠的电源。文章对改进后的UPS供电系统的工作原理、设计方案和设备配置进行了详细论述,对今后长输管道工程站场的UPS系统设计工作具有一定的参考作用。In UPS electric supply system design of Second West to East Gas Pipeline Project, the stationUPS system and compressor unit UPS system are integrated rationally and the structure is improved obviously, so that it can provide continuous, stable, clean and reliable electric power for kinds of important loads. The working principle, design scheme and equipment configuration of the improved UPS system are discussed and it will be helpful for future UPS system design of long-distance pipeline stations.
分 类 号:TE973[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28