西气东输二线压气站场UPS供电系统设计  

UPS Electric Supply System Design for Compressor Station of Second West to East Gas Pipeline Project

在线阅读下载全文

作  者:孙竟[1] 李树山[1] 

机构地区:[1]中国石油天然气管道局设计院,河北廊坊065000

出  处:《石油工程建设》2010年第S1期56-58,296-297,共5页Petroleum Engineering Construction

摘  要:在西气东输二线管道工程压气站场的UPS供电系统设计中,将站场UPS系统和压缩机组UPS系统合理整合,在整体结构上有了较大改进,可向各种重要负载提供连续、稳定、纯净、可靠的电源。文章对改进后的UPS供电系统的工作原理、设计方案和设备配置进行了详细论述,对今后长输管道工程站场的UPS系统设计工作具有一定的参考作用。In UPS electric supply system design of Second West to East Gas Pipeline Project, the stationUPS system and compressor unit UPS system are integrated rationally and the structure is improved obviously, so that it can provide continuous, stable, clean and reliable electric power for kinds of important loads. The working principle, design scheme and equipment configuration of the improved UPS system are discussed and it will be helpful for future UPS system design of long-distance pipeline stations.

关 键 词:长输管道 压气站场 UPS供电系统 设计 

分 类 号:TE973[石油与天然气工程—石油机械设备]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象