西气东输二线西段EPC竣工资料管理  

EPC Project Completion Data Management of West Section of Second West to East Gas Pipeline Project

在线阅读下载全文

作  者:张嘉昌 于永超[1] 

机构地区:[1]中国石油天然气管道局国内事业部,河北廊坊065000

出  处:《石油工程建设》2010年第S1期203-205,307,共4页Petroleum Engineering Construction

摘  要:结合西气东输二线西段管道建设,介绍了竣工资料管理、移交和资料整理应注意的问题。文章指出,工程建设项目的竣工资料管理工作应设专人负责,应制订统一明确的标准要求,应与工程建设项目的进度同步,要做到竣工资料数据的真实、准确、完整。This paper introduces the matters needing attention in management, transfer and compilation of project completion data in association with the construction of West Section of Second West to East Gas Pipeline Project. It points out that the appointed personnel should take the responsibility of project completion data management work, the accordant and definite standard should be established, the data management work should be synchronously done with the project construction schedule, and the reality, exactness and integrity of project completion data should be guaranteed.

关 键 词:EPC总承包 竣工资料 管理 

分 类 号:F284[经济管理—国民经济] F426.22

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象