大口径顶管施工作业管路抱死的解决方法  

Pipe Stuck Resolving Method in Large Diameter Pipe Pushing Construction

在线阅读下载全文

作  者:宋博[1] 隋鲁宁[1] 贾志强[1] 

机构地区:[1]中国石油天然气管道局第四工程分公司,河北廊坊065000

出  处:《石油工程建设》2010年第S1期239-240,310,共3页Petroleum Engineering Construction

摘  要:在油气管道穿越工程中,特殊地质条件下大口径顶管施工作业容易发生管路抱死现象。为解决这一问题,采用了对接顶管施工技术。结合西气东输二线施工案例,对施工过程中的测量及纠偏技术进行了探索和研究,为今后在无水砂卵石等特殊地层条件下的顶管施工提供了有效的方法和依据。In oil and gas pipeline crossing construction under particular geological conditions, large diameter pipeline stuck phenomena often happen in pipe pushing operation. In order to solve such problems, the technique of pipes pushed from both sides till butt jointed is adopted. Associated with the cases in Second West to East Gas Pipeline Project, the research on measurement and deviation rectifying during pipe pushing is conducted. The research results also offer an effective base for other pipe pushing construction under particular geological conditions such as dry pebble sand stratum.

关 键 词:顶管施工 特殊地质 测量纠偏 

分 类 号:TE973.4[石油与天然气工程—石油机械设备]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象