西气东输二线西段X80钢管道冬季焊接施工措施  

Measures for X80 Steel Construction in Winter in West Section of Second West to East Gas Pipeline Project

在线阅读下载全文

作  者:潘会彬[1] 王建国[1] 杨明新[1] 

机构地区:[1]中国石油天然气管道局国内事业部,河北廊坊065000

出  处:《石油工程建设》2010年第S1期251-253,311,共4页Petroleum Engineering Construction

摘  要:西气东输二线西段工程从2008年11月份至2009年3月份,全线进入冬季施工。通过采取一系列技术、质量、管理措施,EPC项目部按期保质保量完成了冬季施工任务,并取得了优异的成绩。文章结合工程实际,从EPC角度出发,对西气东输二线西段冬季施工中所采取的这些措施进行了总结和阐述。The construction of the whole West Section of Second West to East Gas Pipeline was fulfilled in winter from Sept. 2008 to March 2009. By means of a series of measures with respect to technology, quality and management, the EPC Project Department of West Section of Second West to East Gas Pipeline Project finished the winter construction work in good quality and quantity and on schedule. The measures taken in winter construction of the project were summarized in combination with the engineering practice and in view of EPC general contract.

关 键 词:西气东输二线 X80钢管道 冬季施工 措施 

分 类 号:TE973.3[石油与天然气工程—石油机械设备]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象