某框架楼托梁拔柱改造设计与施工  被引量:6

Supporting beam and removing column reform design and construction of a frame structure building

在线阅读下载全文

作  者:王洪波 王宏林 

机构地区:[1]北京正邦兴业建筑技术开发有限公司,北京100083

出  处:《建筑结构》2010年第S2期288-290,共3页Building Structure

摘  要:该工程新的使用功能需将原结构居中的1根框架柱拔掉。设计中采用混凝土框架梁、柱增大截面法,同时框架梁双向跨度变大且形成十字梁。施工中遵循"先加固、后拔柱"的原则,首先对基础注浆加固,对梁、柱分别采用水泥基灌浆料、混凝土增大截面,再行拔柱。The construction of new features needs to remove one frame column.The consolidation beam and column design is given by using cross-section increment in the engineer,and extends for the frame beam of the original structure to form cross-beam.Abide by first strengthening then removing the concrete column in construction,first the foundation is reinforced by pressure grouting technology,beams and columns were used cement-based grouting material and concrete to increase cross-section,then remove the frame column.

关 键 词:托梁拔柱 加固 

分 类 号:TU746.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象