检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国地质大学,武汉430074 [2]中山大学工学院,广州510275
出 处:《岩土力学》2007年第S1期647-652,共6页Rock and Soil Mechanics
摘 要:在深港西部通道深圳侧接线工程填海区基坑工程中,开挖与回填过程中的不均匀沉降问题是该工程设计与施工中的关键技术难题之一。在综合考虑复杂地质条件、结构自身的约束条件以及结构与土体之间相互作用的基础上,采用非线性有限元方法对基坑的开挖与回填过程进行数值分析,研究其变形特性与规律,为工程开挖与回填设计提供重要参考的同时,也验证了该数值模拟方法的合理可行性。Excavation and earth filling of foundation fundation pit under complicated geological conditions is one of the important problems in the underground engineering field. By considering complicated geological conditions,constrained conditions of structure and the interaction between structure and soils,this paper concerns about the nonlinear FEM numerical calculation of excavation and earth-filling of foundation pit by combining with the Western Long Tunnel Construction Project from Shenzhen to Hongkong. The characteristics and regularities of the calculated settlements in the excavation and earth-filling process are obtained. The results can be used as an important reference to the design and construction of engineering.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28