检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]贵阳勘测设计研究院
出 处:《水力发电》1998年第3期57-58,共2页Water Power
摘 要:普定碾压混凝土拱坝筑坝新技术研究是“八五”国家科技攻关专题,在碾压混凝土拱坝结构设计、筑坝材料优选、坝体防渗型式、温度控制和防裂措施、层面结合综合处理技术、变态混凝土技术、狭窄河谷入仓工艺、施工工法和施工质量控制、原型观测技术等方面,开展了研究,取得了可喜的成果。The study on new construction technology for Puding RCC Arch Dam is a scientific study subject listed in the State's Eighth Five Year Plan. This study for RCC arch dam includes the structural design,the optimal selection of dam materials, seepage control types of dam body, temperature control and anti cracking measures, the comprehensive treatment technology on the layer surface, distorted concrete technology, the concrete placing technique in narrow valley,construction method, construction quality control, prototype observation technology, etc.. And the gratifying achievements have been gained.
分 类 号:TV642.4[水利工程—水利水电工程] TV431.1
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28