检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄源芳[1]
机构地区:[1]中国长江三峡工程开发总公司
出 处:《水力发电》1998年第4期36-39,共4页Water Power
摘 要:由于三峡工程水轮机技术上的复杂性和挑战性,在左岸电站14台机组国际招标文件已明确了若干重大技术问题的基础上,在机组议评标阶段,对招标文件进行分析和投标商对投标文件进行澄清说明后,经评议比选,业主又决策了几个重大技术问题,主要有:水轮机设计水头的确定,负倾角叶片水轮机的应用,两套水力设计,舍弃初期转轮,蜗壳进行水压试验等。至此,三峡水轮机重大技术问题的解决已原则上落实。这些重大技术问题的解决将大大促进国际上水轮机技术的发展和我国水轮机制造业的技术进步。Because of the technical complexity of the turbine for the Three Gorges Project and on the basis of several important technical problems which have been defined in the international bidding documents for 14 generating units in the left bank power station, the Owner of the project has decided another some important technical problems based on appraisal and comparison in the bid appraisal stage after the bidding documents are analyzed and the tender documents are cleared by the tenderers. Such problems mainly include: the determination of the turbine design head, the application of the turbine with negative angle runner, two sets of hydraulic design, no initial runner, water pressure test for spiral case, etc.. Up to now, the important technology problems of turbine for Three Gorges Project has been fundamentally completed. The solution of such these important technical problems will greatly promote the development of international turbine technology and the progress of the manufacturing technology in China.
关 键 词:水轮机 设计水头 负倾角叶片 水力设计 三峡工程
分 类 号:TK73[交通运输工程—轮机工程] TV632.63[动力工程及工程热物理—流体机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31