检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王传亮[1] 刘忠兴[1] 李振提[1] 付长春[1]
机构地区:[1]中原石油勘探局采油二厂,河南省范县457532
出 处:《油气井测试》1998年第4期40-43,75,共5页Well Testing
摘 要:目前两流量试并解释方法单一,解释软件缺少历史拟合检验功能。消城油田有杆泵抽油井两流量试并资料影响因素多,导致半对数曲线于变万化,不易准确确定其直线段状况,由此探讨了用近期压力验证所选直线段的四种方法,即①利用本并近期实测油层平均压力pi值验证;②利用本并两流量试并资料估测的值验证;③利用同一开发层系(层位)近期统计值验证;④利用相邻油水井近期统计值验证。通过应用压力验证方法,提高了解释质量,确保了解释成果的可靠性。At present, interpretation method for dual rate well testing is unitary, interpritateon software is short of verification function for history match. From the information of Pachen Oilfield, there are lots of factors affecting dual rate well testing data of pumping wells equipped with rod pumps, resulting in various shapes of semi-log plot, straight line is not easy to be accurately fixed. This paper approaches four metheds to verify the straight line fixed by use of recent pressure in formation, these methods are ① Verification with recent average formationpressure pj actually measured in the same well;②Verification with value evaluated from same dual rate well testing data; ③Verification with recent statistical value from same layer series of development ; ④Verification with recent statistical value from neighbouring oil wells or water injection wells. Application of these pressure verification methods has increased interpretation level and has ensured reliability of interpretation results.
分 类 号:TE3[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222