检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]塔里木石油勘探开发指挥部试油处,新疆库尔勒市841000
出 处:《油气井测试》1998年第4期70-72,76,共4页Well Testing
摘 要:塔里木盆地多数储层为渗透率小于5×10-3μm2的低渗和特低渗层,其测试一般采用传统的两开两关工作制度。通过实例分析说明传统的测试工作制度不适合低渗砂岩层,尤其是二关时间分配不合理。依据测试结果分析,推荐适合塔里木盆地低渗砂岩层DST测试的工作制度:一开15~20min左右,一关3~4h,二开24h左右,二关8h左右。Most of the formations in Tarim Basin are low and extremely low permeability formations with permeability less than 5 ×10-3μm2, usually drill stem test operation adopts conventional flow regime of 'two opening and two shut-in '. The analysis of actual examples proves that conventional DST flow regime is not applicable to low permeable sand stone formations,especially the time distributed for second shut-in is not reasonable. According to test results, this paper analyses and recommends the following flow regime: first opening: 15 ~ 200 min, first shutin 3~4 h, second opening: about 24 h, second shut-in: about 8 h.
关 键 词:塔里木盆地 低渗透储集层 钻柱地层测试 工艺设计
分 类 号:TE3[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117