考虑逆断层的煤层顶底板TIN生成的新方法  

A new algorithm of building coal seam TIN considering reverse faults

在线阅读下载全文

作  者:陈敬柱[1,2] 马念杰[1] 李梅[3] 毛善君[3] 熊伟[2] 

机构地区:[1]中国矿业大学资源与安全工程学院,北京100083 [2]北京龙软科技发展有限公司,北京100190 [3]北京大学地球与空间科学学院,北京100871

出  处:《煤田地质与勘探》2009年第2期10-12,17,共4页Coal Geology & Exploration

摘  要:为了解决逆断层参与下煤层顶底板不易生成TIN的问题,提出了一种新方法。该方法以约束Delaunay三角剖分为理论基础,一方面使生成TIN满足约束Delaunay原则,另一方面又很好地解决了逆断层生成TIN的问题。通过大量煤层正/逆断层和多期叠加断层数据的检验,该算法容易实现,稳定可靠,效率高,并对将来自动生成煤层顶/底板等高线图也很有帮助。In order to solve the difficulty of coal seam TIN dealing with reverse faults, a new algorithm of constrained Delaunay triangulation is proposed. The TIN built by the algorithm, on the one hand meets constrained Delaunay principle, and on the other hand is a good solution for formation of TIN of reverse faults. The algorithm, checked by various coal geological data with complex normal/reverse faults and fault combination, is simple, high-efficient, and useful for automatic creation of coal roof/floor contour map in the future.

关 键 词:煤层 逆断层 约束三角剖分 等高线图 

分 类 号:P628[天文地球—地质矿产勘探] P618.11[天文地球—地质学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象