大断面平顶直墙地铁风道二衬施工受力转换技术  被引量:5

Secondary-lining Construction of Large Cross-section Box-type Ventilation Duct of Metro

在线阅读下载全文

作  者:李峰 杨威虎[1,2] 李连玉 

机构地区:[1]中铁电气化局西安铁路工程有限公司,西安721000 [2]北京交通大学,北京100044

出  处:《都市快轨交通》2009年第2期83-86,共4页Urban Rapid Rail Transit

摘  要:大断面双层双跨平顶直墙暗挖地铁风道施工时具有开挖跨度相对较大、临时支护体系繁多、二次结构受力转换复杂的特点,针对某地铁车站风道双层段的工程实践,分析大断面平顶直墙结构施工时的关键技术环节,如中洞法开挖、受力转换、分块模筑等。结果表明,关键工序合理,切实可行,施工过程中通过受力转换确保了原初期支护结构的稳定和安全,施工过程中严格监测控制,使风道二次衬砌质量得到保证,加快了衬砌施工进度,对整个风道工期控制起到了积极作用。In the construction of the large section box-type ventilation duct of metro with two storeys and double spans,there are many construction features involving large-span excavation,such as complex temporary support system,complicated force transfer for secondary structure and so on.Taking the successful practice of No.1 ventilation duct of Shiliuzhuang road subway station as an example,the paper analyses and summarizes several key technologies such as center heading excavation,force transfer,construction by parts and so on.Reasonable force transfer technique adopted in the construction ensured the stability and safety of the primary support,and strict monitoring and supervision ensured the quality of the secondary lining of the duct.

关 键 词:大断面 地铁风道 二次衬砌 受力转换 平顶直墙 换撑 

分 类 号:U231.3[交通运输工程—道路与铁道工程] TU94[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象