作 者:胡清华[1] 崔可锐[1] 赵川[1] 马文生[1]
机构地区:[1]合肥工业大学资源与环境工程学院,安徽合肥230009
出 处:《安徽地质》2009年第1期52-57,共6页Geology of Anhui
摘 要:安徽淮南刘庄煤矿主井井塔地基工程采用了人工冻结法施工,因而主井井塔地基土发生冻胀和融沉的变化。为了工程的安全和井塔的稳定,本文对主井井塔地基的人工冻融土进行了冻胀和融沉模拟试验,并对试验数据进行分析和计算。本文对人工冻融土冻胀与融沉性质的研究,填补了我国在这方面研究的不足,为今后该方面的工程施工提供了参考依据。Artificial freezing-thawing method was applied to foundation construction of the main shaft tower of the the Liuzhuang coalmine, Huainan, so the change of freezing swelling and thawing subsidence happened to the foundation soil. For the engineering safety and shaft tower stability, this paper made a simulating test on freezing swelling and thawing subsidence properties for the artificial freezing-thawing soil, analysed and calculated the testing data. This study has filled the deficiency in this area in China and provided a basis for reference for the similar engineering work.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31