天荒坪抽水蓄能电站高压隧洞充水试验实测资料分析  被引量:10

Observed data analysis of water filling test of the high-pressure tunnel in Tianhuangping Pumped-Storage Power Station

在线阅读下载全文

作  者:侯靖[1] 

机构地区:[1]华东勘测设计研究院,浙江杭州310014

出  处:《水利水电科技进展》2009年第2期27-31,共5页Advances in Science and Technology of Water Resources

摘  要:分析天荒坪抽水蓄能电站上游高压隧洞观测仪器在充排水试验过程中所记录的实测资料,讨论高压隧洞围岩承载、衬砌构造配筋、衬砌与围岩之间缝隙随内水压力增加而增加等隧洞渗透体积力理论概念,期望通过实测资料来进一步理解和说明高压隧洞渗透体积力理论,以便更好地指导设计。Observed data from a water filling and drainage test in the upper stream high-pressure tunnel of the Tianhuangping pumped-storage power station are analyzed. Several theoretical concept of tunnel permeation volume strength are discussed, such as the the surrounding rock bearing strength, the constructional reinforcement of the tunnel liner, and the increase of the gap between the liner and the tunnel with internal water pressure. The goal is to explain the theory of permeation volume strength in a hlgh-pressure tunnel with observed data, so as to provide better guidance for tunnel design.

关 键 词:天荒坪抽水蓄能电站 高压隧洞 充排水试验 内水压力 渗透体积力 构造配筋 

分 类 号:TV672.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象