检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘耀东[1] 余天庆[1] 石峻峰[1] 李恒太[2]
机构地区:[1]湖北工业大学土木工程与建筑学院,湖北武汉430068 [2]中铁十二局集团有限公司,山西介休030600
出 处:《桥梁建设》2009年第2期72-75,共4页Bridge Construction
摘 要:介绍武汉天兴洲公铁两用长江大桥北汊公路桥深水承台施工所采用的钢吊箱围堰的结构形式,采用结构仿真分析软件MSC-PATRAN对其进行仿真计算。最后介绍钢吊箱围堰施工的几项关键技术,包括悬吊系统的设计、钢吊箱的下沉与定位、封底混凝土的浇注和体系转换。This paper presents the structural type of steel boxed cofferdam used for construction of the deep water pile cap of the north highway bridge of Wuhan Tianxingzhou Changjiang River Rail-cum-Road Bridge, makes the simulation calculation of the cofferdam, using the strueture simulation analysis software MSC-PATRAN and also gives some key techniques for construction of the cofferdam, including those of the design of the suspension system, lowering and positioning, casting of the bottom sealing treime concrete as well as the system transferring of the cofferdam.
分 类 号:U445.556[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.104