检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙毅力[1] 王芝银[1] 曾志华[2] 马兰平[2]
机构地区:[1]中国石油大学(北京)城市油气输配技术北京市重点实验室 [2]中国石油天然气管道工程有限公司
出 处:《油气储运》2009年第4期67-70,共4页Oil & Gas Storage and Transportation
摘 要:以陕西某地黄土边坡斜井穿越工程为例,利用数值模拟分析方法对斜井开挖支护过程进行了仿真模拟计算。通过对五种可能的开挖支护方式所引起的整个斜井洞周的受力变形特征、塑性区分布规律的对比分析,设计了该斜井合理的支护方式。研究结果表明,斜井的中间部位受力变形较大,支护过程中应重点关注。Taking the oblique well crossing craft in a loess steep slope in some location of Shan'xi Province as an example,a method of numerical analysis is used to simulate and calculate excavation and support process of an oblique well.Five potential schemes are simulated and analyzed.After calculation,results including the stress,deformation of the cavern boundaries and distributive laws of the failure field are studied and compared.Based on these analyses,an optimum support scheme is given.Numerical simulation is performed to confirm the optimum support scheme.Result shows the middle of the oblique well should be highly focused on due to its large stress and deformation during supporting.
关 键 词:油气管道 施工 黄土陡坡 斜井穿越 支护方式 设计
分 类 号:TE243[石油与天然气工程—油气井工程] TD353[矿业工程—矿井建设]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40