Manufacturing Resource Planning Technology Based on Genetic Programming Simulationnn  被引量:3

Manufacturing Resource Planning Technology Based on Genetic Programming Simulationnn

在线阅读下载全文

作  者:GAO Shiwen LIAO Wenhe GUO Yu LIU Jinshan SU Yan 

机构地区:[1]College of Mechanical and Electrical Engineering, Nanjing University of Aeronautics and Astronautics, Nanjing 210013, China [2]China Aerospace of Science and Technology Corporation, Beijing 10003 7, China

出  处:《Chinese Journal of Mechanical Engineering》2009年第2期177-183,共7页中国机械工程学报(英文版)

基  金:supported by National Hi-tech Research and Development Program of China (863 Program, Grant No. 2002AA411030);National Defense Foundation Scientific Research of China (Grant No. d2520061124)

摘  要:Network-based manufacturing is a kind of distributed system, which enables manufacturers to finish production tasks as well as to grasp the opportunities in the market, even if manufacturing resources are insufficient. One of the main problems in network-based manufacturing is the allocation of resources and the assignment of tasks rationally, according to flexible resource distribution. The mapping rules and relations between production techniques and resources are proposed, followed by the definition of the resource unit. Ultimately, the genetic programming method for the optimization of the manufacturing system is put forward. A set of software for the optimization system of simulation process using genetic programming techniques has been developed, and the problems of manufacturing resource planning in network-based manufacturing are solved with the simulation of optimizing methods by genetic programming. The optimum proposal of hardware planning, selection of company and scheduling will be obtained in theory to help company managers in scientific decision-making.Network-based manufacturing is a kind of distributed system, which enables manufacturers to finish production tasks as well as to grasp the opportunities in the market, even if manufacturing resources are insufficient. One of the main problems in network-based manufacturing is the allocation of resources and the assignment of tasks rationally, according to flexible resource distribution. The mapping rules and relations between production techniques and resources are proposed, followed by the definition of the resource unit. Ultimately, the genetic programming method for the optimization of the manufacturing system is put forward. A set of software for the optimization system of simulation process using genetic programming techniques has been developed, and the problems of manufacturing resource planning in network-based manufacturing are solved with the simulation of optimizing methods by genetic programming. The optimum proposal of hardware planning, selection of company and scheduling will be obtained in theory to help company managers in scientific decision-making.

关 键 词:resource planning network-based manufacturing simulation optimization initial scheduling 

分 类 号:TP311.1[自动化与计算机技术—计算机软件与理论] F270.7[自动化与计算机技术—计算机科学与技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象