灌注桩检测中BOTDR温度补偿试验研究  被引量:12

Experimental Study on BOTDR Temperature Compensation in Bored Pile Detection

在线阅读下载全文

作  者:朴春德[1,2] 施斌[2] 朱友群[2] 卢毅[2] 

机构地区:[1]中国矿业大学资源与地球科学学院,江苏徐州221008 [2]南京大学光电传感工程监测中心,南京210093

出  处:《防灾减灾工程学报》2009年第2期161-164,共4页Journal of Disaster Prevention and Mitigation Engineering

基  金:教育部重点项目(01086)资助

摘  要:运用基于布里渊光时域反射计(简称BOTDR)的温度自补偿方法,采用特殊封装的温度传感光纤,检测了灌注桩在混凝土养护期内由温度变化引起的应变变化量和静载荷试验过程中的温度变化。结果表明:混凝土养护末期由温度引起的应变变化量很小,说明在混凝土养护末期,其水化热已消散;在灌注桩静载荷试验过程中,由温度补偿光纤所测的温度变化引起的应变量值也很小。因此,在灌注桩光纤分布式检测中,由温度引起的光纤应变检测误差可忽略不计。Based on the temperature compensation method of Brillouin Optical Time-Domain Reflectometer (BOTDR), specially packaged fibers of temperature sensing were used to detect temperature variations in static load test and strain changes caused by the change of temperature during concrete curing period of bored pile. The research results show that the strain changes due to temperature are small at the end of curing period, indicating that hydration heat has been dissipated; and the same conclusion holds as well in the static load test process. As a result, the strain detection error caused by temperature can be ignored in the distributed fiber optic sensing detection of bored pile.

关 键 词:灌注桩 应变检测 BOTDR 温度补偿 

分 类 号:TU473.1[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象