检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]山东理工大学建筑工程学院,山东淄博255049
出 处:《建筑管理现代化》2009年第2期135-137,共3页Construction Management Modernization
摘 要:工业建设项目的选址工作,应综合考虑各种社会政治因素、经济因素和环境因素等影响,选择各方案差异较大的经济因素作为重点分析对象,提出多因素排序法。该方法将层次分析法(AHP)与空间统计学的距离综合评价法相结合,利用层次分析法给出各因素的权重,用距离综合评价法对决策对象的相对接近度进行排序,进而做出最优决策。利用该方法对一个电厂项目的可选地区优劣程度进行排序,结果客观有效。Factors of social politics, economy and environment should be taken account of in the location of the industry construction project. The economic factor was particularly discussed which differs in various schemes. The multiple factors ranking was presented that combines the Analytic Hierarchy Process (AHP) with distance comprehensive evaluation of spatial statistics. The weight of each factor was calculated by AHP and the relative approach degree of decision objects was ranked by distance comprehensive evaluation for an optimal decision. The methods were used in the location of an electrical factory to rank the schemes. The results show the objectivity.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28