高原环境下110kV城网迎峰过冬的可行性研究  被引量:1

Feasibility study of 110kV urban network running at power peak in winter with plateau environment

在线阅读下载全文

作  者:刘春艳[1] 李钊年[1] 李文秀[1] 王佐亮 

机构地区:[1]青海大学,青海西宁810016 [2]青海桥头铝电有限公司,青海西宁810016

出  处:《电力系统保护与控制》2009年第8期63-66,共4页Power System Protection and Control

基  金:青海大学中青年科研基金项目(2008-QG-12)

摘  要:针对高寒地区特殊的气象条件,研究了110kV城网中提高导线温度的可行性及提高导线温度后主变的过载能力,并给出了计算依据和结果。线路试运行结果表明,将导线允许温度从70℃提高到80℃时,除部分配套金具不能满足要求外,主变及其他均能安全运行。This paper studies feasibility and major transformer's over loading ability of improving temperature of conducting wire in 110 kV urban network in a condition of special plateau environment, then provides calculation basis and results. The test run result of transmission line shows that if we increase permitted temperature of conducting wire from 70℃ to 80℃,the major transformer and other devices can be safe in operation except that a part of auxiliary accessories can not meet the need.

关 键 词:高寒地区 导线容许温度 主变 过载能力 输送容量 

分 类 号:TM732[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象