桐柏抽水蓄能电站面板堆石坝坝身溢洪道工程特点  被引量:6

Engineering Characteristics of Dam-body Spillway of Rockfill Dam with Concrete Face Slab for the Tongbai Pumped Storage Power Station

在线阅读下载全文

作  者:姜忠见[1] 郑齐峰[1] 郎玲芳[1] 

机构地区:[1]中国水电顾问集团华东勘测设计研究院,浙江杭州310014

出  处:《水力发电》2009年第3期41-43,56,共4页Water Power

摘  要:到目前为止,世界上已建成的采用坝身溢洪道的面板堆石坝仅有3座,有关这方面的研究国内外均处于起步阶段。桐柏抽水蓄能电站下库面板堆石坝根据工程的具体条件,选择采用了坝身溢洪道,其溢洪道布置、主要技术问题及对策措施,可为今后其他类似工程泄流方案选择提供参考。There are only three rockfill dams with concrete face slab, using dam body as its spillway in the world at present. The study on this field is only in initial stage at home and abroad. The rockfill dam with concrete face slab for the lower reservoir of the Tongbai Pumped Storage Power Station adopted the dam-body spillway in accordance with its concrete conditions. Its layout of spillway, main technical problems and corresponding reference for similar projects in the future. could be used for

关 键 词:面板堆石坝 坝身溢洪道 沉降 结构 桐柏抽水蓄能电站 

分 类 号:TV641.43[水利工程—水利水电工程] TV652.9

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象