机构地区:[1]三峡水力发电厂运行部,湖北省宜昌市443133 [2]宜昌永光电力设备有限责任公司,湖北省宜昌市443000
出 处:《水电自动化与大坝监测》2009年第2期14-17,共4页HYDROPOWER AUTOMATION AND DAM MONITORING
摘 要:在三峡电厂厂用交流电源全部消失、机组全部停机、外部电网大停电时,电厂可利用三峡电源电站机组具备黑启动功能这一特点,迅速启动电源电站机组,恢复对泄洪闸的供电,保证大坝的安全;给三峡左、右岸电站提供厂用电,恢复三峡电厂的运行,从而恢复对外部电网的供电。文中分析了三峡电源电站机组黑启动的功能及特点,并对黑启动的流程及黑启动成功后对全厂和外部电网的恢复过程进行了分析,提出了合理的恢复电源的步骤,并分析了影响机组黑启动的关键因素。Through the black start function of the units of the power service station of the Three Gorges Hydropower Plant (TGHP), the units can be quickly started and the power supply for the flood gates can be restored when the AC auxiliary power supply of the TGHP disappears, all the units are shut down and external power network fails. So the power supply for the left station and right station can be restored, the safe operation of the dam and the plant is ensured. The black start control function and its characteristics of the units of the power service station are analyzed, and the recovery process of the power system of the whole plant and external power network after black start succeeds is analyzed, too. Finally, the key factors influencing the black start are analyzed, and the reasonable step for the recovery of power supply is put forward.
分 类 号:TV734.4[水利工程—水利水电工程] TM761[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.211