检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国网直流工程建设有限公司,北京市100005
出 处:《电力建设》2009年第5期85-87,共3页Electric Power Construction
摘 要:在直流工程换流站的建设过程中,对施工现场、工程进度、工程质量及环保等工作的有效管理非常重要。建设项目管理的重点在于现场管理的执行力。管理的思路是安全、质量、进度、投资、环保等要素管理的超前策划、提前预控、事后闭环。现场管理的落点在于项目经理,项目经理管理的要点在于主动及时的协调管理,项目团队大局意识是建精品工程的有力保证。In the process of DC converter station construction, it is very important to have effective management on construction site, schedule, quality, and environmental protection, etc. The key to construction project management is on-site execution; the idea of management is advance planning, early pre-control, and afterwards close-loop on key elements, like safety, quality, schedule, investment, and environment protection, etc. Project manager is the maj or factor of on-site management,who must eye on proaetive and timely coordination. Awareness of team work guarantees a high quality project.
分 类 号:TM63[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.82