特高压线路铁塔几种组立施工方法  被引量:35

Several UHV Tower Assembly and Erection Methods

在线阅读下载全文

作  者:郑晓广[1] 李君章[1] 

机构地区:[1]河南送变电建设公司,郑州市450057

出  处:《电力建设》2009年第4期39-43,共5页Electric Power Construction

摘  要:1000kV晋东南—南阳—荆门特高压交流试验示范工程输电线路铁塔组立相对500 kV线路铁塔而言,具有高、大、重的特点,其组立施工难度更大。其铁塔型式主要有3种:猫头塔、酒杯塔、干字塔,每种塔型均有相应的特点,在组立施工时不能一概而论。在11标段组塔中采用了几种组塔方法,这几种方法各有特点,可以根据具体情况在特高压线路中加以应用。Compared to normal 500 kV counterparts, towers used in the 1 000 kV Jindongnan-Nanyang-Jingmen UHV AC Demonstration Line Project are much taller, bigger, and heavier, and more difficult to assemble and erect. There are 3 major types, namely, eat-head-shaped tower, cup- shaped tower, and :1=-shaped towers, each having its own characters, which requires special attention in construction. Several tower assembly and erection methods are used in No.11 bidding section. Each method has its own characters and can be used in UHV lines according to specific circumstances.

关 键 词:特高压 铁塔 组立方法 

分 类 号:TM752[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象