出 处:《南方电网技术》2009年第2期18-22,共5页Southern Power System Technology
基 金:国家"十一五"科技支撑计划支持项目(2006BAA02A18)~~
摘 要:研究了云南—广东±800kV直流系统交、直流侧以及直流线路的过电压水平和换流站避雷器保护方案。重点分析了孤岛运行过电压,不同平波电抗器布置方式和避雷器方案对过电压的影响以及±800kV直流的绝缘配合方法。推荐两个避雷器配置方案以降低最高电位换流变压器阀侧绝缘水平。建议线路中部10km范围内操作过电压按1.85p.u.标准,10km以外按1.70p.u.标准。通过合理配置,±800kV直流极线侧设备绝缘水平可降低至现有±500kV直流工程极线侧设备绝缘水平线性外推值的75%左右。The overvoltage and insulation coordination of Yunnan-Guangdong +800 kV UHVDC transmission system are studied with focus on the following subjects: the overvoltage in the island operation mode, the influence of different smoothing reactors arrangement, and the insulation coordination method for the UHVDC transmission system. Two schemes of arrester configuration are put forward in order to reduce the insulation requirement of the highest potential valve side of converter transformer. Meanwhile it is suggested that the switch impulse overvoltage level could be adopted as 1.85 p.u. for the middle section of the 10 km transmission line, and 1.70 p.u. for the other. By adopting appropriate configuration, the equipment insulation level of ± 800 kV UHVDC pole line side can be limited to about 75% of the extrapolated value from 500 kV to 800 kV based on the linear relationship between the insulation level and the DC voltage.
关 键 词:特高压直流输电 换流站 过电压 绝缘配合 绝缘水平
分 类 号:TM721.1[电气工程—电力系统及自动化] TM863
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15