检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]深圳招商地产股份有限公司 [2]清华大学
出 处:《暖通空调》2009年第5期135-138,共4页Heating Ventilating & Air Conditioning
基 金:国家科技支撑计划资助项目(编号:2006BAJ03A10)
摘 要:对应用于南海意库3#办公楼的温湿度独立控制空调系统进行了实际运行测试与实践,结果表明溶液除湿新风机组承担了室内全部潜热负荷以及人员的显热负荷,室内空气温度约为25~26℃、相对湿度约为50%~60%,且干式风机盘管在整个供冷季保持干工况运行。新风机组宜提前1.5~2h开机对室内除湿,高温冷水机组宜提前1~1.5h开机除去室内显热负荷。Presents the operating and testing results of the system applied in this building, which show that the liquid desiccant fresh air handling unit can totally eliminate the space moisture load and the sensible load from the occupants and that the indoor temperature is about 25 - 26℃, the relative humidity is around 50% - 60%, and the dry fan-coil unit can keep dry condition in the whole cooling period. In the project, the fresh air handling unit should be operated 1.5 - 2 hours in advance to eliminate the latent heat load and the high temperature water chiller should be operated 1 - 1.5 hours in advance to carry away the indoor sensible heat load.
关 键 词:温湿度独立控制 干式风机盘管 溶液除湿 运行实践
分 类 号:TU831.8[建筑科学—供热、供燃气、通风及空调工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.17