基于LCC的变电站改造风险评估模型研究  被引量:8

LCC-based risk assessment models for substation retrofits

在线阅读下载全文

作  者:蒋跃强[1] 李福兴[2] 高翔[2] 

机构地区:[1]华东电网有限公司,上海200002 [2]华东电力试验研究院有限公司,上海200437

出  处:《华东电力》2009年第4期562-564,共3页East China Electric Power

摘  要:变电站改造评估应以变电站改造风险评估为依据,结合LCC经济性评价,从全寿命资产管理的角度进行综合分析。通过建立变电站风险评估模型,分析设备风险和系统风险,并对风险成本采用LCC方法进行量化分析,多方案对比、论证及选择和优化,最终决策改造方案。It was proposed in the paper that the retrofit assessment for substations should be based on risk assessment and a comprehensive analysis should be conducted in terms of life cycle management for assets. The substation risk assessment model was established for analyzing the risks of equipment and the system, and the LCC method was used to quantitatively analyze the risk cost. Through comparison, selection, and optimization, the final retrofit scheme could be determined.

关 键 词:全寿命成本(LCC) 风险评估 变电站改造 

分 类 号:TM63[电气工程—电力系统及自动化] F407.61[经济管理—产业经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象