检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐南山
出 处:《内燃机车》2009年第5期26-27,37,共3页Diesel Locomotives
摘 要:按照机车验收体制改革的要求,利用过程管理的方法,探讨形成满足过程控制要求的驻段验收室机车验收方式,监督驻在段质量管理体系运行的适宜性、符合性、有效性,实现验收方式由终验把关型向控制预防型的转变。According to requirements of locomotive acceptance system reform, the process management method is used to develop a new locomotive acceptance mode executed by locomotive acceptance office of Railway Administration in depot for meeting the requirements of process control, supervise the suitability, compliance and effectiveness of the quality management system in the depot, and achieve the change of acceptance mode from strictcheeck at final acceptance to controllable and preventive acceptance.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.12.149.233