检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]东南大学土木工程学院,南京210096 [2]东南大学建筑设计研究院,南京210096
出 处:《建筑技术》2009年第5期452-455,共4页Architecture Technology
摘 要:结合一栋带结构转换层的高层建筑结构设计过程,比较了板式、梁式转换层的优缺点,同时分析了钢筋混凝土转换梁与型钢混凝土转换梁的差别,提出了适用于本工程的型钢混凝土主梁转换与钢筋混凝土次梁转换相结合的主次梁转换方案,分析了型钢混凝土梁的承载能力。通过工程实例详细介绍了型钢混凝土转换结构的设计计算要点,对同类工程设计具有一定的参考价值。Based on the practical design process of a high-rise building with transition structure, the advantages and disadvantages of slab transition and beam transition are compared in this paper and differences between reinforced concrete transition beam and profiled-steel reinforced concrete beam are analyzed. Scheme for transition between primary and secondary beams with combination of profiled steel reinforced concrete primary beam and reinforced concrete secondary beam applicable to this project is proposed and bearing capacity of the profiled steel reinforced concrete beam is analyzed. Key points for design and calculation of profiled steel reinforced concrete transition structure are introduced in details in terms of practical projects, providing certain reference values for design of similar projects.
关 键 词:框支转换层 型钢混凝土梁 主次梁 弹性动力时程分析
分 类 号:TU972[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.203