检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:沙鹏[1,2] 孙毅[1] 马强[1] 刘熔[1,2] 林海英[1] 曾日华[1,2] 王光伟[1]
机构地区:[1]中国科学院高能物理研究所,北京100049 [2]中国科学院研究生院,北京100049
出 处:《强激光与粒子束》2009年第5期745-748,共4页High Power Laser and Particle Beams
基 金:国家自然科学基金项目(10675142)
摘 要:为了抑制BEPCⅡ多束团(93团)、大流强(910 mA)时的纵向振荡(零模),引入了BEPCⅡ零模束流反馈系统。该系统首次应用于BEPCⅡ储存环上,它包括了束流信号采集、滤波、下变频、鉴相、移相等几个部分。使用该系统后,束流的纵向边带被抑制度大于10 dB,这表明,系统能够抑制束流的纵向振荡。The BEPCⅡ is a double-ring collider with high current(0.91 A) and lots of,which had bunches(93 bunches). In order to inhibit the longitudinal oscillation (0-mode), a 0-mode beam feedback system was used never been used at the storage ring of the BEPCⅡ. It is made up of beam signal collection, filter, down conversion, phase detectior, phase shifter, etc. When the system runs, the longitudinal sideband will be suppressed by more than 10 dB. It shows that the system can inhibits the longitudinal oscillation effectively.
关 键 词:纵向不稳定性 零模束流反馈 腔式滤波器 低频移相器
分 类 号:TL503.2[核科学技术—核技术及应用]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.119.140.58