检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:唐义彬
出 处:《铁道建筑技术》2009年第5期57-60,64,共5页Railway Construction Technology
摘 要:根据在浙江苍岭隧道施工中发生的岩爆,通过现场地质观测资料,分析了其形成的规模、位置、诱发因素以及地质条件,从地质工程的角度,对岩爆发生地段隧道的岩石组成、地质构造、地应力特征以及地下水情况进行了探讨,发现在苍岭隧道施工中发生岩爆的岩石具有岩体结构面发育适中、弹性模量大、P波波速高、地质构造简单、现代水平构造应力强且主压应力轴σ1大角度相交于隧道中轴线和地下水不发育的特征,并在此基础上,提出了掌子面喷水、布设释放地应力锚杆、减少隧道壁聚能结构等有效的岩爆防治措施。According to the rock burst which occurs in the Zhejiang Cangling Tunnel construction, through the scene geology observed data, this article has analyzed the scale, the position, the suggestion factor as well as the geological condition specifically it forms. Based on the geological project, it has discussed the tunnel' s rock composition, the geologic structure, the crustal stress characteristic as well as the ground water situation to the rock burst section, and discovered that the rock burst rock in cangling tunnel construction has the features of the rock mass structural plane growth moderately, the big elasticity coefficient, the high P wave velocity, the simple geologic structure, the strong stress in modem horizontal tectonic, and the compression stress axis σ1 wide angle intersection in the tunnel axle. And based on this, it has proposed some suggestions of spraying water on face, setting up anchor rods to release crustal stress, reducing tunnel wall binding energy structure and so on.
分 类 号:U455.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222