检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王素敏[1] 刘厚凡[1,2] 周新木[1] 史爱芹[1] 潘庆辉[1] 夏国强
机构地区:[1]南昌大学理学院化学系,江西南昌330031 [2]江西筐庐科技有限公司,江西南昌330068
出 处:《湿法冶金》2009年第2期92-95,共4页Hydrometallurgy of China
基 金:江西筐庐科技有限公司资助项目;江西省教委基金资助项目(2002-Z1816)
摘 要:研究了贫锰矿与锌精矿同时浸出及以硫磺形式回收硫。通过试验,得到贫锰矿浸出锌精矿的最佳工艺条件为:始酸质量浓度150g/L,温度90~95℃,液固体积质量比7:1,贫锰矿过量1.5倍,硫酸过量1.5倍,浸出时间4h。在此条件下,锰的一次浸出率为85.2%,锌浸出率为83.0%。Simultaneous leaching of Lean manganese ore and zinc sulphide concentrate and recovery of sulfur as sulphur are researched. The results show that best conditions of simultaneous leaching of manganese and zinc is sulfuric acid of 150 g/L, temperature of 90-95 ℃, ratio of liquid to solid of 7 - 1, lean manganese mass to its theory dosage of 1.5 times, and sulfuric acid mass to its theory dosage of 1. 5 times, leaching time of 4 hours. At the conditions, leaching ratio of manganese is of 85.2%, and leaching ratio of zinc is of 83.0%.
分 类 号:TF803.21[冶金工程—有色金属冶金]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.14.17.231