机构地区:[1]国家电力监管委员会电力可靠性管理中心,北京100761
出 处:《中国电力》2009年第5期1-6,共6页Electric Power
摘 要:通过对2008年全国220kV及以上电压等级输变电设施的可靠性指标的统计,对影响变压器、断路器、架空线路3类主要输变电设施可靠性的计划停运、非计划停运的主要因素进行分析与评估。特别是通过近几年的指标分析比较,提出影响可靠性因素的变化趋势,为未来几年提高输变电设施可靠性提供有益的依据。According to the statistics on reliability indices of nation-wide 220 kV and the above power transmission and transformation facilities in 2008, the main causes of scheduled and unscheduled outages were analyzed and evaluated, which affected the reliability of 3 kinds of power transmission and transformation facilities - transformer, circuit breaker and overhead line, and the main influencing causes of scheduled and forced interruption were analyzed and evaluated. Through the analysis of reliability indices in recent years, the changing tendency that affected the main causes of reliability was put forward, which provided the beneficial basis for improving the reliability of power transmission and transformation facilities in the coming years.
分 类 号:TM732[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145