机构地区:[1]国网交流工程建设有限公司,北京市西城区100140 [2]山西省电力建设四公司,山西省太原市030012
出 处:《电网技术》2009年第10期38-41,共4页Power System Technology
摘 要:交流特高压试晋东南变电站1000kVGIS基础为超长、大体积混凝土基础,设计强度等级为C30,预埋件数量众多、单件大而重,且施工时正值冬季。因此,防止大体积混凝土裂缝的产生和冻害,成为施工时的关键问题。该文重点介绍了施工时所采取的多项技术措施,包括:混凝土统一配合比环保配制;分块分层浇筑、阶梯推进的施工方法;采用暖棚法对大体积混凝土进行温度控制,保证环境温度不超过0~5℃。The foundation for 1000kV gas insulated switchgear (GIS) in 1000kV AC Southeast Shanxi substation is a ultra-long mass concrete foundation, there are a lot of embedded parts in this foundation with a lot of embedded parts which are large size and the each single piece of the parts is heavy and large-sized. Because it is predetermined to construct this foundation in winter and its designed strength grade is C30, thus it becomes a key problem to prevent the cracks and frost damage of massive concrete during winter construction. In this paper the technical measures adopted in winter construction of mass concrete foundation are emphatically presented, such as environment-protective manufacture of unified concrete mixture ratio, block by block and layer of layer concreting, construction scheme of stepped marching, controlling temperature of mass concrete by warm shed to ensure the ambient temperature within the range from 0℃to 5℃, etc.
分 类 号:TM595[电气工程—电器] TU7[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28