1000kV变电站主变110kV侧并联电容器装置的参数选择  被引量:26

Parameters Selection of Shunt Capacitor Device at 110 kV Side of Main Transformer in 1 000 kV Substation

在线阅读下载全文

作  者:吴祎琼[1] 黄宝莹[2] 燕立[1] 庞亚东[1] 

机构地区:[1]北京国电华北电力工程有限公司,北京市西城区100011 [2]国网北京经济技术研究院,北京市宣武区100761

出  处:《电网技术》2009年第10期42-47,共6页Power System Technology

摘  要:1000kV变电站主变低压侧的并联电容器组是特高压电网无功调节的重要装置。与超高压电网相比,特高压变电站低压并联电容器组的电压更高、容量更大,其参数选择有其特殊性。文章结合特高压试验示范工程,确定低压电容器组的分组方式及最大分组容量,研究电容器装置的额定参数选择和接线方式,并对电容器装置的合闸涌流进行校核。The shunt capacitor bank at low voltage side of main transformer in 1000kV substation is an important device for reactive power regulation. The voltage borne by shunt capacitor bank at low voltage side of main transformer in 1 000 kV substation is higher than that used in EHV power network and its capacity is higher than that used in EHV power network too, thus the parameters selection of shunt capacitor bank at low voltage side of main transformer in 1 000 kV substation possesses its own particularity. Based on 1000kV power transmission pilot project in China, the grouping mode of such a low voltage capacitor bank and its maximum group capacity are determined, the selection of rated parameters of the shunt capacitor device and its connection mode are researched, besides, the close inrush current of the shunt capacitor device is verified.

关 键 词:1 000kV变电站 主变低压侧并联电容器 分组方式 最大分组容量 额定参数 接线方式 合闸涌流 

分 类 号:TM714[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象