检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国家地震局地质研究所
出 处:《工程地质学报》1998年第1期27-39,共13页Journal of Engineering Geology
摘 要:本文根据广东沙环核电厂厂址地震地质环境特点和有关核法规的技术要求完成了设计地面运动时程的人工合成。从持续时间、合成精度、包络设计谱、功率谱密度函数、多根合成时程的统计不相关等方面讨论了该人工合成设计时程对ASCE4-86StandardandCom-mentaryonStandard和U.S.NRCSatndardReviewPlan两个基本法规技术要求的可接受性。The design ground motion time histories was synthesized for the Shahuan Nuclear Power Plant Site according to the characteristics of the site and the specifications of input motion in the paper. The acceptability of synthetic time histories for the specified criteria by U. S. NRC Standard Review Plan and ASCE4 86 Standard SASRNS and Commentary on Standard for SASRNS was also discussed from the total time duration, the envelop design response spectra, the frequency intervals in the computed spectra and spectral values, adequately matching a target PSD function compatible with the design response spectra and the input motion time histories to be statistically independent and so on.
分 类 号:TM623.1[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.2