检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]四川农业大学城乡建设学院,四川都江堰611830 [2]四川铁科建设监理公司,成都610031
出 处:《工业建筑》2009年第5期68-70,共3页Industrial Construction
摘 要:预应力混凝土结构比钢筋混凝土结构跨径大,承受的荷载大,预应力混凝土越来越多地应用于工程中。先张法与后张法相比,施工工艺简单、施工进度快、效率高、成本低。对先张法预应力混凝土空心梁板的一个长线台的钢绞线伸长量计算、钢绞线张拉、混凝土浇筑等关键过程进行深入细致地研究。The prestressed concrete structure can be used in the large span structure and bears heavy load, comparing to reinforced concrete structure and used widely in projects. In comparison with the post stressed concrete structure, the prestressed concrete structure is easy, fast, cost-effective and high-efficient to be built. It is normally used in hollow beams and planks of the span of 13 ( 16, 20) meters. It was analyzed that the key procedures, such as the extension calculation of steel strand and its stretching on a long-lines stand, concrete casting etc and precutions of pretensioned PC hollow beams used for an expressway.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.182