蒲石河抽水蓄能电站预应力闸墩空腔式锚块的计算分析  

Calculation and analysis on hollow anchor block of prestressed pier for Pushihe Pumped Storage Hydropower Station

在线阅读下载全文

作  者:温中华[1] 解伟[1] 闫飞[1] 

机构地区:[1]华北水利水电学院,河南郑州450008

出  处:《水利水电技术》2009年第5期39-41,共3页Water Resources and Hydropower Engineering

基  金:华北水利水电学院青年科研基金(HSQJ2008003)

摘  要:采用通用的有限元程序ANSYS对起关键作用的闸墩颈部和预应力锚块建立模型,并通过改变对预应力效果影响较大的空腔尺寸计算颈部和锚块的应力,通过分析比较最终确定出合理的预应力闸墩空腔锚块的结构型式。A model is established for the analysis on the pier neck with key role on the pier structure and the pre-stressed anchor block of the pier for Pushihe Pumped Storage Hydropower Station based on the finite dement analysis program of ANSYS, and then the pier neck and anchor block are calculated through changing the hollow size that has greater influence on the pre-stressed effect, and finally a reasonable structure of the hollow anchor block for the pressed pier is determined on the basis of the analytical comparison concerned.

关 键 词:蒲石河抽水蓄能电站 闸墩 预应力 空腔式锚块 有限元 

分 类 号:TV662.2[水利工程—水利水电工程] TV231

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象