检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘卫其[1] 顾光富[1] 周满意[1] 崔静贤[1] 王晓燕[1]
机构地区:[1]河北省水利水电勘测设计研究院,天津300250
出 处:《南水北调与水利科技》2008年第A06期45-46,51,共3页South-to-North Water Transfers and Water Science & Technology
摘 要:南水北调中线京石段应急供水工程初步设计中仅计列了131座公路桥,用以恢复公路交通路网的功能。但是,仍有大量的生产生活道路被截断,对沿线群众的生产和生活造成了一定的影响。为了恢复部分生产道路的交通功能,初步设计审查意见明确增建生产桥,有关部门经过多方论证,确定了生产桥的设置原则和规模。通过对京石段生产桥设计过程的回顾,提出对生产桥设计的探讨。In Emergency Water Supply Project of the South-to-North Water Transfer Project, there are only 131 road bridges designed for the transportation recovery. However, there are many roads were cut away by the canals and it influenced the local residents. In order to recover the transportation, the temporary bridge must be constructed. The rule and scale of the temporary bridges were determined and the design is discussed and reviewed.
分 类 号:TV68[水利工程—水利水电工程] U448.14[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28