京石段总干渠桥梁建设对水面线的影响分析  

The Effects of the Bridge Construction to the Water Surface Profile in Jingshi Section Project

在线阅读下载全文

作  者:李亚峰[1] 赵春锁[1] 单木双[1] 

机构地区:[1]河北省水利水电勘测设计研究院,天津300250

出  处:《南水北调与水利科技》2008年第A06期239-241,共3页South-to-North Water Transfers and Water Science & Technology

摘  要:南水北调中线京石段应急供水工程在实施过程中,发现初步设计批复的桥梁数量偏少,按其实施,将给两侧群众生产生活带来极大不便。根据现状交通路网情况及当地政府和沿线群众的呼声,在初步设计批复的交通桥基础上,需要增加一定数量的生产桥。由于桥梁的墩柱侵占总干渠的过水断面,会造成阻水影响而产生水头损失,相应会影响总干渠的输水规模。通过分析桥梁等跨渠建筑物建设对水面线的影响,提出了增加桥梁后,不影响初步设计水面线成果,得出了能够保证总干渠设计输水规模的结论。In the process of implementation of the Jing-Shi section emergent water project of the Mid-Route of South-North Water Transfer Project, and according to the current situation of transportation network and the needs of the local government and people, some certain amounts of bridges are required to increase on the basis of the inspection and agreement of the initial design of related transportation bridges. The pillars of bridges occupied wetted cross-section of the Main Channel led to obstruction of flowing and thus water loss, and correspondingly affected the total volume of water transfer in the Main Route. To guarantee the total volume of water transfer in the Main Channel, it is significantly important to analyze the effects of the bridges and cross-channel building construction on water surface profile.

关 键 词:南水北调中线工程 桥梁建设 水面线 影响分析 

分 类 号:TV68[水利工程—水利水电工程] U445[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象