检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄必虎[1]
机构地区:[1]广东水电二局股份有限公司,广东增城511340
出 处:《水力发电》2009年第4期29-30,73,共3页Water Power
摘 要:株溪口水电站工程基础岩溶发育丰富,存在大规模高流速、管道型涌水通道。对这种复杂地质基础的处理,应先查明岩溶发育规模及分布范围,采取引管控制出口流量,结合在合适位置进行井点抽排水,然后覆盖基础混凝土,将涌水通道封闭,采取先堵后灌的方法,有效降低水流流速,再采用水泥灌浆进行堵漏,能取得有效而且经济的处理效果。该基础岩溶处理技术,可供其他工程处理类似问题时参考。In the Zhuxikou Hydropower Station, there is rich in the development of karst and a lot of seepage passages with large scale and high speed of water flow. In order to treat such complex geological foundation, we should firstly find out the development scale and distribution range of karst and adopt the diversion pipe to control the outlet discharge. Then the well pumping water was adopted in proper locations and foundation concrete was poured to block the water seepage passage. The first blockage and then grouting method can effectively reduce the water flow speed. The cement grouting was used to block seepage, which could achieve effective and economical treatment results. Such karst foundation treatment technology could be used for reference for other similar projects.
关 键 词:岩溶 溶槽溶洞 漏水通道 堵漏灌浆 株溪口水电站
分 类 号:TV736[水利工程—水利水电工程] TU47[建筑科学—结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.44