机构地区:[1]北京市水利规划设计研究院,北京100044 [2]中国水电工程顾问集团公司,北京100120
出 处:《水力发电》2009年第4期54-56,共3页Water Power
摘 要:南水北调中线工程北京段惠南段~大宁段采用2排直径4 m的PCCP管道,管道单线总长50 km。管线需穿过西甘池隧洞和崇青隧洞。西甘池隧洞埋深浅、地质条件复杂,为此,比较了钢筋混凝土衬砌、钢板衬砌和洞穿PCCP管结构3种方案,最终采用洞穿PCCP方案。现工程基本完工,表明该方案可行。Two lines of Pre-stressed Concrete Cylinder Pipe (PCCP) with the diameter of 4m and the total length of 50 km each were used in Huinan-Daning section of the South to North Water Transfer Project Middle Route in Beijing area. The pipeline should pass through the Xiganchi and Chongqing tunnels. Because of shallow buried depth and complex geological conditions of the Xiganchi tunnel, three alternatives of reinforced concrete lining, steel plate lining and PCCP passing through the tunnel have been compared, and then the final alternative was adopted. Now the project has been completed basically, which showed such alternative is feasible.
分 类 号:TV672.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145