检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:韩奎峰[1]
机构地区:[1]徐州师范大学
出 处:《金属矿山》2009年第6期104-106,144,共4页Metal Mine
基 金:徐州师范大学自然科学基金重点项目(编号:07XLA13)
摘 要:首先分析了几种开采沉陷预计数据(下沉,倾斜,曲率,水平移动和水平变形)的特点,介绍了上述几种数据的表达方式,根据数据特点提出了沉陷预计结果数据的预处理方法。通过研究提出了将预计结果数据嵌入矿区DEM的方法——双线性重采样插值法,经实例验证该方法达到了预期目标,为矿区的DEM更新做出了贡献。The characteristics of several kinds of forecast resuh data of mining subsidence ( sinking, inclination, curvature, horizontal movement and horizontal deformation) and their representation methods were analyzed. Based on this, a pre-treatment method for the forecast result data of subsidence was proposed. As a result of the research, a method for embedding these data in mine DEM-bilinear resampling interpolation was put forward, which was proved to have attained the goal by real case, making a contribution to mine DEM updating.
关 键 词:概率积分法 开采沉陷预计数据 双线性重采样插值方法 DEM
分 类 号:TD327[矿业工程—矿井建设] TP391.41[自动化与计算机技术—计算机应用技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.127