检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《桥梁建设》2009年第3期51-54,共4页Bridge Construction
基 金:国家高新技术研究发展(863)计划(2006AA11Z120)
摘 要:进行一座主跨1 400 m的部分地锚式斜拉桥的方案试设计,通过成桥状态结构受力分析探讨该桥型的静力性能,同时证明该方案是成立的。相对于全自锚式斜拉桥,该桥型具有材料用量节省、极限静风工况结构响应改善、静力稳定性和施工状态颤振临界风速提高等诸多优点。The trial design of a proposed partially ground-anchored cable-stayed bridge with a main span 1 400 m is made. The static performance of the bridge is studied through the mechani- cal analysis of the bridge in completion state and the bridge is proved to feasible. In comparison to the fully self-anchored cable-stayed bridge, the proposed bridge has lost of advantages like the material saving, improvement of the structural response under ultimate static wind load and enhancement of the static stability and fluttering critical wind speed in construction state.
分 类 号:U442.5[建筑科学—桥梁与隧道工程] U448.27[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28