某输气管道线路工程地质灾害及其防治建议  被引量:1

THE GEOLOGICAL HAZARDS AND PREVENTING AND CONTROLLING SUGGESTIONS IN A GAS PIPELINES ROUTE PROJECT

在线阅读下载全文

作  者:王政[1] 傅荣华[1] 刘洪炼 杨涛 

机构地区:[1]成都理工大学环境与土木工程学院,成都610059 [2]四川华地建设工程有限责任公司,成都618000 [3]四川省泸州市一三五岩土工程有限公司,泸州646000

出  处:《地质灾害与环境保护》2009年第2期20-24,共5页Journal of Geological Hazards and Environment Preservation

摘  要:西气东输二线工程龙岗支干线输气管道工程长达610 km,横贯我国四川、陕西、湖北、河南4省,沿线地质灾害类型多样。做好线路地质灾害研究及岩土工程勘察,制定并实施好地质灾害防治对策,对于确保国家西气东输工程的顺利实施和输气管道安全施工与运营十分重要。The Longgang branch gas pipeline of The Second West-to-East Gas Pipeline Project in China is over 610km long. Most of it is located in complicated geological environments with various kind of geological hazards, it is very important to make sure that the construction of the project can be successfully completed and its operation is safe and reliable. Therefore, ngood engineering survey, and the effective measures must be carefully taken to prevent and control geological hazards on the project

关 键 词:西气东输二线工程 龙岗支干线 地质灾害 防治建议 

分 类 号:P642[天文地球—工程地质学] P694[天文地球—地质矿产勘探]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象