检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]同济大学,上海市200092 [2]美国麦王环保能源集团麦王环保工程技术有限公司,上海市200135
出 处:《城市道桥与防洪》2009年第6期175-178,共4页Urban Roads Bridges & Flood Control
摘 要:控规阶段,为了充分满足10 km^2规划新区的防洪排涝要求,在用地布局、水系统和绿地系统规划、竖向规划等四个方面进行了全面综合考虑,并与当地防洪排涝专项规划设计进行协调、取得一致,以全面增强规划新区抵御洪涝灾害的能力。该文介绍的思路可供雨洪控制规划参考。In order to fully meet the requirements of flood control and drainage in a new 10-km^2 planned area in the control planning stage,it is comprehensively to consider the land layout,the water system,the systematical planning of greenbelt and the vertical planning.It is to coordinate with the local special planning design of flood control and drainage to achieve the consistence fully to strengthen the capability of the new planned area to resist the flood and waterlog calamity.The thinking introduced in the article can be referred for the rainwater and flood control planning.
分 类 号:TV122.1[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.128.153.31